Jan 10, 2017
|
0 comments
|
The cranes lifted the pipeline for temporary placement over the waters of the Port of Antwerp in Belgium, a stretch of pipe typically used to carry sludge to the plant. Each crane lifted a 6.1 t section of the pipe positioned on its own pontoon, floating in the port. Eight supervisors watched over