Nov 29, 2015
|
0 comments
|
Georgia Power completed the 15-hour, 2,400 cubic yard continuous pour at the Plant Vogtle nuclear expansion site, reports Power Engineering. The pour consists of self-consolidating concrete measuring 10 feet thick, which will build the Unit 3 “turbine tabletop.” Source: http://www.constructionequipment.com/time-lapse-video-shows-15-hour-2400-cubic-yard-concrete-pour