Construction of a solar garden begins at GVSU

Consumers Energy and Grand Valley State University broke ground Friday on Michigan’s largest community solar panel project.
The solar garden project is designed to provide energy at a more affordable cost. Over 17 acres of land in the southwest portion of GVSU’s campus will hold about 11,000 solar panels. It will produce three mega-watts of energy, which is slightly more than a wind turbine.
Customers will be able to subscribes for “half-a-kilowatt”, with flexible monthly payments for three, seven or 25 years. Customers can also receive credit based on the amount of solar energy produced.
Consumers Energy plans to finish the project and begin operations in the spring of 2016.
A second solar garden is planned for Kalamazoo.
Recent News
May 1, 2017
0 Comments
The gold mine in North Mara is situated in the north-west of Tanzania, at about 100 kilometres east of Lake Victoria and 20 kilometres south of the border with Kenya. The gold mine works an average of 8,000 tonnes of minerals a day and produced 287,188 ounces of gold in 2015. The gold
May 1, 2017
Workers’ Memorial Day, observed each year on April 28, honors workers killed, injured, or made ill at work. Since 1992, BLS has collected data on both nonfatal work injuries and illnesses that result in days away from work, and fatal work injuries. In 2015, the occupations with the highest number of nonfatal injuries and illnesses
Apr 28, 2017
The undercarriage of a machine represents a significant portion of a piece of equipment’s purchase price. Proper maintenance and operation practices are critical for protecting your equipment investment. Undercarriage maintenance is critical to the overall productivity of a machine. It is the mechanism that gives tracked machines much of their power and stability. It also
Apr 27, 2017
John Deere is now offering a 96-month / 20,000-hour power electronic components warranty on the Deere 944K hybrid wheel loader. The warranty is retroactive to existing machines in the field and provided on new 944K loaders through October 31, 2018. The warranty includes a 96-month (eight-year) or 20,000-hour (whichever comes first) non-prorated assurance on wheel
Apr 27, 2017
Vermeer’s Silver Series drill rod is composed of S135 common grade steel and is threaded in the same facility as the company’s Firestick drill rod with the same column wall thickness. The Silver Series drill rod is available in four sizes: 1.66-inch, 1.9-inch, 2.06-inch, and 2.375-inch, for use on the D7x11 through the D24x40
Apr 26, 2017
Datos de Cámara Chilena de la Construcción estimaron retroceso de 7,5% en febrero que se suma al -10% de enero. Se busca consolidar esfuerzos público-privados para enmendar el rumbo. Por primera vez desde el año 2002, cuando se comenzó a publicar el Índice de Actividad de la Construcción Regional (INACOR), la Región de Coquimbo inicia